It’s Official: 2018 Was the Fourth Warmest Year on Record
The data means that the five warmest years in recorded history have been the last five, and that 18 of the 19 warmest years have occurred since 2001. New York Times
The data means that the five warmest years in recorded history have been the last five, and that 18 of the 19 warmest years have occurred since 2001. New York Times
At a location where once pure oxygen was produced, an outstanding new area was developed which offers on ten hectares space for around 1,500 residents and up to 3,000 workplaces. Suurstoffi Energy Design Holzer Kobler Architekturen
With a storage capacity of 7.5 MWh the battery provides grid services for the grid balancing market, which is estimated 1,400 MW in Europa , 74 MW in the Netherlands , 603 MW in Germany, 47 MW in Belgium , 561 MW in France, 62 MW in Austria and 68 MW in Switzerland. ee news
aliunid is developing innovative business models by providing a platform that links existing infrastructure with customer demands. aliunid
Several thousands of end consumer devices are connected to the tiko network, which is delivering energy and grid services across Europe. The platform allows to scale up to several million devices to be managed. tiko
The business model of Quartierstrom: Locally generated electricity should be also locally used. This is demonstrated in the region Walenstadt, where a local electricity market was installed. Demand and supply determine the price for electricity via a blockchain based transaction platform. Quartierstrom
© Stefan P. Schleicher 2024